The transformer mainly uses aviation hydraulic oil in the work, if the test is not guaranteed in the operation, it is very that every part, each effect of the test, can not play the characteristics of the transformer abnormally. The following export transformer manufacturers say power transformer operation inspection standards.
The power transformer inspection mainly tests its residual oil, oil color and oil temperature, to see whether the quality of its oil is guaranteed, and to see whether it has long been leaked. Second, it is necessary to check to see if the appearance of the power transformer has changed, and if it has long been deformed, it should be stopped immediately. Finally, to see if the sound of its power transformer is normal when it is in operation, it is important to pay more attention to the sound of the machine and equipment, because the sound of the machine can reflect its condition. Finally, it should be checked frequently to see whether everything is normal in the region such as its shell and zinc oxide arrester, and also to test its oil shut-off valve, when there is no abnormal situation in such areas, indicating that it can operate normally.
Power Transformer Operation Inspection Standards
Jul 07, 2023
Send Inquiry
Latest News
Contact Us
- Tel: +86-513-88781828
- Fax: +86-513-88837088
- Email: Ryancustomerinquiry@redq.cc
- Add: No.229, Huanghai West Road, Haian City, Jiangsu Province, China.










