🔋 Initial Energization Steps
Apply reduced voltage (if possible) for initial testing.
Gradually increase to full rated voltage.
Monitor inrush current (should stabilize within seconds).
📊 Post-Energization Checks
Measure load current (should not exceed nameplate rating).
Check for abnormal noise or vibrations.
Monitor temperature rise (compare with manufacturer limits).











